• <delect id="h6ld1"></delect>
  • 
    
    • <fieldset id="h6ld1"><optgroup id="h6ld1"></optgroup></fieldset><samp id="h6ld1"><acronym id="h6ld1"></acronym></samp>

      国产精品视频免费一区二区_99久久精品日本一区二区免费_99久久久无码国产精品不卡_精品久久久久久亚洲综合网_亚洲国产精品久久久久久无码

      Wuxi Precision Casting Factory home, welcome to visit Wuxi Yongsheng Metals Goods Co.,Ltd.!

      Favorite | Problem | Sitemap

      page_banner
      Home ?

      Company News

      OK precision casting and holding pressure and mold filling time method

      Publisher: Wuxi Yongsheng Metals Goods Co.,Ltd. Release Time:2015/10/18 21:15:44 Clicks:1284 Close

         Die Casting time includes filling, pressing and precision die-casting mold casting in the residence time of holding. It is the pressure, speed, temperature, these three factors, plus the consolidated results of the physical properties of liquid metal, casting structure (especially wall thickness), mold structure (especially the gating system and overflow discharge system) and other aspects.
        1, holding pressure time. Holding pressure time depends on the material and wall thickness precision casting. High melting point, crystallization temperature range Japanese thick-walled castings, holding pressure time should be longer. Crystallization temperature range of small and thin walled castings, holding pressure time can be shorter. If the holding pressure time is less, it could easily lead to shrinkage. But holding pressure time is too long, will not achieve significant results, it could easily lead to removal of excess material difficulties vertical die casting machine. From the liquid metal fill the cavity to the gate completely solidified, the continued duration of the injection plunger under the action called holding pressure time. Holding pressure time is the role of the injection plunger has enough time passed to the pressure of solidified metal casting under pressure to ensure the crystallization, strengthen feeding, in order to obtain a dense tissue.
        2, open-time. After holding pressure should remove mold precision casting products. From the end of the injection die casting mold open time called time. Enough time to allow the casting mold in the mold will have a certain strength, without deformation during mold opening and ejection or crack. Meat mold time is too short, the strength is still relatively low at the time of casting on the release, casting deformation. Low intensity alloy may also be due to expansion of internal pores produce surface blistering. But mold too long, the temperature is too low precision casting products, shrink large, and the top of the casting core pulling resistance is also large, hot brittleness of the alloy castings also cause cracking, but also reduce the productivity of the casting.
        3, the filling time. When the die-casting liquid metal into the die-casting mold cavity from the beginning to the time required until full cavity called filling time. The length of time depends on casting to fill the volume of the size and complexity. Large and simple products, filling time is relatively longer, complicated and thin wall castings to segment some of the filling time. Fill time adjustment method and adjustment method is similar to filling speed.  http://www.cnwxyszj.com

      Products

      Aluminum alloy precision casting
      Stainless steel castings
      Stainless steel castings
      Stainless steel castings
      Similar articles Top
      1
      Stainless steel cast
      2
      Casting Production C
      3
      Improve product qual
      4
      Precision casting pr
      5
      Stainless steel prec
      6
      Precision castings i
      7
      OK precision casting
      8
      Stainless steel ingo
      9
      Stainless steel cast
      10
      Sol precision castin
      News articles
      1
      Sol-depth analysis o
      2
      Precision casting pr
      3
      Points to note desig
      4
      Reduce the impact of
      5
      Stainless steel cast
      6
      Stainless steel cast
      7
      Pressure casting
      8
      Improve product qual
      9
      Note the use of the
      10
      Casting Production C
      ????

      QQ??????

      • Customer Advisory
      • ??????????????
      • ??????????????
      • Technical consulting
      • ??????????????
      Click to hide
      国产亚洲av综合人人澡精品_99久久精品日本一区二区免费_99久久久无码国产精品不卡_精品久久久久久亚洲综合网
    • <delect id="h6ld1"></delect>
    • 
      
      • <fieldset id="h6ld1"><optgroup id="h6ld1"></optgroup></fieldset><samp id="h6ld1"><acronym id="h6ld1"></acronym></samp>